Asset

Asset Management Plan 2013

The Plan is publicly available in accordance with the Electricity Distribution Information Disclosure Determination 2012.

  1. An Asset Management Plan ('AMP') has been prepared by WEL Networks Limited and approved by the WEL Networks Ltd Board.  The AMP is available for inspection at the offices of WEL Networks, 114 Maui Street, Te Rapa, Hamilton, between the hours of 9am and 5pm, on usual working days excluding the period 23 December 2013 till 3 January 2014 (inclusive).
  2. The AMP applies for the 10 year planning period from 1 April 2013 until 31 March 2023.
  3. WEL's next AMP will be available no later than 1 April 2014.
  4. The AMP contains the information required by the Electricity Distribution Information Disclosure Determination under Part 4 of the Commerce Act 1986.
  5. A PDF copy of the plan can be downloaded here (PDF 4.39MB)

Please contact us at connect@wel.co.nz if you would like to receive a printed copy of the AMP.

 

 

 

 

 

 

Last updated: Thursday, 28 March 2013

 

Latest News

WEL Networks Returns $21.8 Million in Discounts to Waikato Customers
Media Release 22 April 2013   Waikato-based electricity distributor, WEL Networks (WEL) today... more...
WEL Networks Takes Top Gong at National Line Mechanic Competition
MEDIA RELEASE   21 November 2012     Click here to read media release... more...
WEL NETWORKS FLEET TO CARRY NEW LIFESAVING TECHNOLOGY
Media Release 29 August 2012     WEL Networks Ltd has installed life-saving defibrillators in... more...
In-home Smart Boxes to Reduce Outages and Give Waikato Households More Control Over Power They Use.
Media Release 23 August 2012     By the end of 2013 almost 40,000 Waikato households will... more...
Raglan Community House Saves Through Solar Power Trial
MEDIA RELEASE 28 November 2011   Raglan Community House saves through solar power... more...