You'll need:
If the quote needs to include street light reticulation costs please provide a Streetlight Reticulation plan along with your load profile.
It depends on the complexity of the project but typically, for commercial/industrial connections, it takes between ten to twelve weeks to provide a fixed price quote. This allows time to:
Providing all relevant information at the start of the process will help make the process as efficient as possible.
Yes there is an Application fee required before we can commence design and analysis of your project. To find out more contact WEL Networks.
All goods and services and WEL equipment supplied by us are supplied on the basis of the Quote together with these terms and conditions. Read the full Ts and Cs here.
Copyright WEL Networks 2017
Responsive Development by Digital Stream