As an electricity network business, WEL Networks is required to produce and publish a current Participant Rolling Outage Plan which outlines our procedures should major generation shortages or transmission constraints occur.
This plan complies with the System Operator Rolling Outage Plan (SOROP).
Copyright WEL Networks 2017
Responsive Development by Digital Stream